Residential Technical Review Checklist This document is intended for internal use by reviewers, however it is being provided as a reference tool for our customers. The following are some of the basic or frequently overlooked code requirements. This list is not intended to be exhaustive of all possible requirements. The Documentation Review Checklist helps you conduct a meaningful review of your documentation pieces, whether you hold technical review meetings and/or send the checklist to individual reviewers. You can customize each line item in the checklist to fit your specific document and review needs. Download the Documentation Review Checklist in MS Word. Or download the Documentation Review Checklist in MS Excel. Customize the front page, including headers, footers, logos, and other standard/required text. Customize the checklist line items/rows in the table to fit the review requirements you need for a specific document.

On this page:
Purpose
Background
Roles and Responsibilities
Process
QA Review Checklists

Purpose

This Guideline provides an overview of the Denver Service Center Quality Assurance (DSC QA) Process for reviewing design documents.

Background

As a Federal Government organization, the Denver Service Center (DSC) is responsible for assuring the quality of all design documents. These documents must be biddable and buildable. The regulatory basis for this requirement exists in the Federal Acquisition Regulation (FAR) where it states:

Section 46.102 - Policy

Agencies shall ensure that:

  1. Contracts include inspection and other quality requirements, including warranty clauses when appropriate, that are determined necessary to protect the Government's interest.
  2. Supplies or services tendered by contractors meet contract requirements.
  3. Government contract quality assurance is conducted before acceptance (except as otherwise provided in this part), by or under the direction of Government personnel.

To meet this requirement, the DSC developed the DSC QA Process to ensure the production of high quality design documents.

Roles and Responsibilities

Denver Service Center Quality Assurance (DSC QA)

DSC QA ensures delivered products meet the established programmatic, performance, and technical goals of the project.

DSC QA reviews each project for overall adherence to:

File Review Checklist
  • Scope and budget
  • DSC Design Standards
  • Design Deliverables requirements
  • Programmatic requirements
  • NPS design ethic
  • Appropriate design for the location
  • NPS policies and guidelines
  • Health, safety, and functional requirements

and adequacy of construction documents (biddable and buildable) to construct the intended facility.

Architect-Engineer (A/E) Contractor

For each project the A/E Contractor is responsible for:

  • Adherence to scope and budget
  • Consistency with DSC Design Standards
  • Adequacy and completeness of Design Deliverables (Content and Format)
  • Integration of programmatic requirements
  • Conformance with NPS design ethic
  • Appropriateness of design for the location
  • Conformance with NPS policies and guidelines
  • Compliance with health, safety, and functional requirements

File Review Checklist

The A/E Contractor is also responsible for Quality Control (QC) which includes ensuring the technical accuracy, completeness, and correctness of the design, and cost estimate and all engineering aspects and details, including coordination of all disciplines with each other and with the specifications.

This is consistent with the FAR, which states:

52.236-23 Responsibility of the A/E Contractor.

As prescribed in 36.609-2(b), insert the following clause:

RESPONSIBILITY OF THE A/E CONTRACTOR (APR 1984)

  1. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services.
  2. Neither the Government's review, approval or acceptance of, nor payment for, the services required under this contract shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract, and the Contractor shall be and remain liable to the Government in accordance with applicable law for all damages to the Government caused by the Contractor's negligent performance of any of the services furnished under this contract.

Process

DSC QA reviews are conducted at major project submission milestones:

  • 100% Draft Predesign
  • 100% Draft Schematic Design
  • Design Development
  • 100% Draft Construction Documents
  • 100% Complete Construction Documents.

Milestone submission content and format requirements for both Design-Bid-Build (DBB) and Design-Build (DB) are located on the DSC Workflows website's Design Deliverables - Content and Format Requirements section.

Prior to each design submission, A/E Contractors shall perform a QC review. After each QC review, A/E Contractors shall revise submission documents per their QC review findings.

A/E Contractors shall submit design submissions to the DSC per the Task Order (TO) Scope of Work (SOW) submission requirements.

DSC Project Management will initiate the QA process by submitting a QA Request Form and providing the submission documents to the DSC Technical Branch QA Technical Specialist.

The DSC QA Technical Specialist checks the project submission documents into the QA system and the QA review begins. QA reviews are typically completed within 10 working days except for 100% Complete Construction Document reviews which are typically completed within 5 working days. DSC QA Technical Specialists will use individualized QA review checklists as guides in performing their reviews. The checklists are designed to be comprehensive, but do not necessarily include all items that may be reviewed on a particular project. Not all items shown on the checklists are applicable to every project. In addition, not all of the DSC QA Technical Specialists will be required on every project.

QA review comments are recorded on the QA Review Form, a Microsoft Excel file, with a summary cover sheet and individual reviewer sheets. As separate sheets within the file, individual reviewer sheets are formatted to allow A/E Contractors to respond to QA review comments.

DSC Project Management is notified when QA reviews have been completed and is responsible for transmitting completed QA reviews to A/E Contractors.

Mor File Review Checklist

A/E Contractors shall resolve all QA review comments and respond to all QA review comments on the QA Review Form's individual reviewer sheets.

Iep File Review Checklist

Except for Predesign submissions ,each subsequent design submission shall include the previous submission QA Review Form with A/E Contractor responses to all QA comments.

The QA Process is completed when all quality assurance review comments have been fully addressed by the A/E Contractor within the 100% Complete Construction Documents.

Quality Assurance (QA) Review Checklists

File Review Checklist

FORMS LIBRARY ASSISTANCE: Forms@GSA.gov

LATEST UPDATES

GSA 7662 - U.S. Bank Travel Card Approval Application - Revised - 12/1/2020

GSA 3677 - Review of Reasonable Accommodation Request - Revised - 11/20/2020

SF 94 - Statement of Witness - Renewed and Revised - 11/19/2020

SF 122A - Transfer Order Excess Personal Property (Continuation Sheet) - Created - 11/17/2020

OF 3667 - Application for Pretax Transportation Fringe Benefits - Revised - 11/5/2020

GSA 3667 - Application for Pretax Transportation Fringe Benefits - Revised - 11/5/2020

GSA 4006 - Subcontracting Plan Review Checklist - Revised - 11/3/2020

SF 1199A - Direct Deposit Sign-Up Form - Revised - 11/2/2020

SF 94 - Statement of Witness - Renewed - 10/30/2020

GSA 3602B - Credit Card Collection - Revised - 10/23/2020

OF 7 - Property Pass - Revised - 10/14/2020

SF 294 - Subcontracting Report for Individual Contracts - Revised - 10/7/2020

The GSA Forms Library contains these forms and views:

Special Education File Review Checklist

GSA Forms (GSA)
This is a list of all GSA forms. These are most often used by GSA employees, contractors and customers.

Cor File Review Checklist

Standard Forms (SF)
This is a list of standard government forms that start with the letters 'SF'.

Lihtc File Review Checklist

Optional Forms (OF)
This is a list of optional government forms that start with the letters 'OF'.

Other Forms
This is a list of forms from GSA and other agencies that are frequently used by GSA employees.

Visit GSA SmartPay to find state tax exemption forms and/or links directly to state websites.

Find federal forms and applications, by agency name on USA.gov.